FAQ on Pre-Test BSUT Warm-Up

Q: Should I skip the test that say power down the BSUT into standby mode for an hour? If not how do I power down the BSUT into standby mode?

A: Following the test procedure, before running the FOD tests the BSUT will need to be switched on for an hour. Once the BSUT has warmed up after an hour only then testing can be performed.