FAQ on GRL-C3-MP-TPR Duty Cycle Measurement

Q: How do I calculate and measure duty cycle?

A:

Duty cycle can be measured from the oscilloscope sample rate using the following formula:

Formula: (TOn / time) %, where time will vary based on cycle to cycle and ranges from (2777ns +/-100ns)

Note: Duty cycle is not calculated for FSK / ASK messages.